| MODULE
1: 2 hours
Introduction
Types
of Equipment
Vapor
compression cycle and equipment
Absorption
cycle and equipment
Thermal
storage systems
Rating
chillers
MODULE
2: 2 hours
Refrigerant
Issues
System
Design Options
Single chiller systems
Parallel chiller systems
Series chiller systems
Primary-secondary systems
Primary variable flow
Pump
and Piping Basics
Pump characteristics and curves
Calculating head
Water balance
Cooling
Towers
Types of towers
Components and materials
Condenser water temperature control
Selection considerations
Operational considerations
|
MODULE
3: 2 hours
Energy
Efficiency and Operational Considerations
Free cooling
Hot gas by-pass
Heat recovery condensers
Variable speed drives
Drive-line retrofits
Control systems
Efficient operations
Maintenance recommendations
Central
Plant Retrofit Considerations
Reasons for retrofit
Alternatives to consider
Retrofit process
Case
Studies
Refrigerant retrofit
Piping system retrofit
System optimization analysis
|